Skip to content
Shop Log in

Home / Insights / Business Development

Business Development · 2026-11-17

Fusion in 2026 by the Numbers: Records, Money and the Distance Still to Go

By Mattias Christian Knutsson · 3 min read

Winding mountain path with stone milestone markers leading to a glowing ring of light above the summit

Fusion energy attracts more headlines than most technologies at its stage of development. A useful corrective is to line up what has actually been measured, by whom and when, against what a power plant would need. This scorecard uses only figures published by the laboratories, agencies and industry body involved.

Scorecard 1: energy gain

  • Laser fusion (NIF, United States). On 5 December 2022 the National Ignition Facility produced 3.15 MJ of fusion energy from 2.05 MJ of laser energy on target, a target gain of about 1.5 (LLNL). In April 2025 it reached a record 8.6 MJ from 2.08 MJ, a gain above four (LLNL).
  • What is still missing. LLNL researchers note that the NIF laser facility typically consumes about 100 times more energy than it delivers to the target (LLNL), and experts cited by LLNL estimate that a target gain approaching 15 would be needed for a test facility with zero net electric demand (LLNL).

Scorecard 2: energy per pulse

The Joint European Torus (JET) in the UK set a record of 69.26 MJ of fusion energy in a single pulse lasting a few seconds, using just 0.21 mg of fuel, in its final deuterium-tritium campaign in 2023 (EUROfusion). The record shows how much energy a tiny amount of fusion fuel holds; it was not a demonstration of energy gain.

Scorecard 3: duration

Power plants need to run for hours, not seconds.

  • China’s EAST tokamak held a high-confinement plasma for 1,066 seconds in January 2025 (ITER).
  • France’s WEST tokamak held a plasma for 1,337 seconds on 12 February 2025, about 25% longer than EAST’s record, injecting 2 MW of heating power (CEA).

These are records for duration, not for fusion output: neither experiment used deuterium-tritium fuel.

Scorecard 4: the flagship schedule

ITER’s revised baseline, published in July 2024, moves to a “Start of Research Operation” with full magnetic energy in 2036 and deuterium-tritium operation from 2039, at an estimated additional cost of about EUR 5 billion (ITER). Its mission remains to show Q≥10, that is 500 MW of fusion power from 50 MW of heating.

Scorecard 5: money and timelines

The Fusion Industry Association reported in July 2026 that private fusion companies raised a record $4.48 billion in the preceding twelve months, bringing the total since 2021 to $14.24 billion across 56 companies (FIA). In the same survey:

  • 71% of companies expect fusion electricity on the grid in the 2030s;
  • funding was named the biggest challenge (67%), with an average reported need of $2.7 billion per company;
  • six companies have siting agreements and five have power purchase agreements.

The distance still to go

Requirement for a power plant Best published result Gap
Gain well above 1, including plant energy use Target gain above 4 (NIF, 2025) Facility-level energy balance not yet reached
Large fusion energy output 69 MJ per pulse (JET, 2023) Seconds-long pulses; no gain demonstrated
Continuous operation 1,337 s (WEST, 2025), no D-T fuel Hours-long D-T operation not yet shown
Grid electricity None yet First pilot plants targeted for the 2030s

Table: BusinessCraft summary based on the sources linked in this article.

Each line shows real progress, and each line shows a gap. No single machine has yet combined high gain, high output and long duration, which is the combination a power plant needs. The next test of that combination in a magnetic-confinement device is CFS’s SPARC; see our SPARC timeline and Q>1 test.

Key figures

Key figures
Figure Value Source
NIF first target gain (Dec 2022) 3.15 MJ from 2.05 MJ (≈ 1.5) LLNL
NIF record (Apr 2025) 8.6 MJ from 2.08 MJ (> 4) LLNL
JET fusion energy record 69.26 MJ EUROfusion
WEST plasma duration record 1,337 s CEA
ITER deuterium-tritium operation From 2039 ITER
Private fusion funding, 12 months to Jul 2026 $4.48bn ($14.24bn since 2021) FIA

Figures as published by the linked sources; table compiled by BusinessCraft.

Related reading

This article is general information, not investment advice.

Sources

  1. LLNL: LLNL’s breakthrough ignition experiment highlighted in Physical Review Letters
  2. LLNL: LLNL experts foster national fusion energy ecosystem at IFE-STAR conference (April 2025)
  3. EUROfusion: Breaking new ground: JET tokamak’s latest fusion energy record (Feb 2024)
  4. CEA: WEST beats the world record for plasma duration (Feb 2025)
  5. ITER: Achievements at EAST and WEST
  6. ITER: New baseline – prioritize robust start of exploitation (Jul 2024)
  7. Fusion Industry Association: record annual funding of $4.48bn (Jul 2026)
Mattias Christian Knutsson
Founder & Editor, BusinessCraft
Mattias Christian Knutsson is the founder of BusinessCraft Nordic AB and primary author on businesscraft.se.
About Mattias and BusinessCraft → · Biography →

The monthly letter